
Eero Muhonen
© by Eero Muhonen 2016-2022 (Music by E.muhonen - Sonic Milestones II )

Olympus E-PM2
about
Flower Power
This is some kind of experimental case to learn taking pictures and macro pictures. I'm using Olympus Pen Mini E-PM2. It's really does live up to its name. With a prime or collapsible kit zoom lens mounted, it is very small indeed. It isn't quite pocketable, but it's undeniably more convenient to carry around than any DSLR.
-
16MP CMOS Four Thirds sensor
-
3.0 inch touch-sensitive LCD with 460,000 dots
-
ISO 200-25,600
-
In-body image stabilization
-
Up to 8fps continuous shooting (fixed focus and exposure with I.S. off)
-
1080 HD video at 30p
-
TruePic VI processor
-
12 Art Filters
-
Raw image capture
The E-PM2 borrow the Olympus OM-D E-M5's proven 16MP CMOS sensor, a class-leader in image quality. Coupled with a TruePic VI image processor, a fast rate of 8fps continuous shooting is possible. Twelve Art Filters are available to the shooter, with a number of Art Effects ready to be applied on top of these processing modes.